Performed drilling of piles under the foundations, under the leader drilling driven piles with a diameter from 300 mm to 1200 mm to a depth of 10 meters, and installation of screw piles to 325 mm. Drilling rigs is performed on the basis of crawler excavators Komatsu PC200-8 hydrolysates equipped with torque up to 25,000 Nm, which is much stronger and more efcient than conventional yaburov on the basis of the car.
1