Will make a new Foundation under the existing structure. Otremontirovanny the old Foundation. Raise the house as wood and bricks to the desired height for the gravy strips of a new Foundation. Produce the injection of the concrete under the strip Foundation to strengthen the soil. Manufacture and install under the existing structure and new screw piles. Variant of bored piles as well as produce under the house or outdoors on a construction site. Cast into the ground and bored piles with ushireniem at the base ( anchor ) demerom to 450mm. Under light buildings on Bucuresti soils do adjustable Foundation. The wooden structures are changing: the joists,the floor and lower crowns have become unusable. Possible trips. Produce and drilling operations under bored piles in difficult access areas ( slope,hill,ravine among the trees). Plan under the building ( excavation work ). Work with a guarantee. Rinkes 2005. THE IMPOSSIBLE IS POSSIBLE.