1. Installation:
• internal power supply systems (apartments, shops, offices, private houses, apartment buildings);
• external power supply systems (cable lines 0,4; 6; 10; 35 kV, aerial line 0,4; 6; 10 kV)
2. Installation: couplings, terminal boxes K. P. P., voltage 0,4; 6; 10; 35 kV (vinyl-insulated oil-filled cables, cables with sewed polyethylene).
3. Installation of substations of any complexity 0,4/6 kV, 0.4/10 kV; 6/35 kV;10/35 kV.
Electrical laboratory services (testing, commissioning, relay protection, measurement of the ground loop, the loop phase is zero). The head of production laboratory Buda Sergey 093-473-47-60
4. Design.